- 200 amp service upgrade for a fourplex in North York, Toronto
- New service mast, fused main disconnect and 4-gang meter base
- One meter for each of the building’s four units
- Every PVC run bent to match for a uniform wall
- Finished after dark in the snow — clocked out at 9:18 PM
Some jobs can’t wait for better weather or a longer day. This 200 amp service upgrade for a fourplex in North York, Toronto ran well past dark, with snow coming down, and our crew stayed until the new multi-unit service was finished. We clocked out at 9:18 PM — then came back to photograph the same wall in daylight.
The building is a 4-unit apartment building, and the scope was a complete new service: a new service mast, a fused main disconnect, and a 4-gang meter base with one meter for each unit. Every PVC conduit run on the wall was bent to match, so the finished installation reads as one clean, uniform layout rather than four separate add-ons.
What This Fourplex Service Upgrade Involved
A 200 amp service upgrade on a multi-unit building means rebuilding the equipment that brings power from the utility into the property. On this North York job, that included:
- New service mast — the riser that brings the service into the building
- Fused main disconnect — one main shutoff, fuse-protected, for the whole service
- 4-gang meter base — four meter positions, one meter for each unit
- Matched PVC runs — every conduit run bent to match across the wall
One Meter for Every Unit
The 4-gang meter base is what makes this a true multi-unit service. With one meter per unit, each apartment’s electricity use is measured separately instead of the building being read as a single customer. For a 4-unit building, that means four meter positions in a single assembly — which is exactly what went onto this wall.
Finished After Dark, in the Snow
Service work doesn’t always fit inside a workday. This one ran into the night and into the snow, and we stayed on site until the job was done, clocking out at 9:18 PM. The video shows the finished wall that night and then again in daylight, where the new mast, disconnect, meter base and matched PVC runs are easy to see.
Multi-Unit Service Upgrades in Toronto
If you own or manage a fourplex or small apartment building in North York or elsewhere in Toronto, a 200 amp service upgrade with per-unit metering is a job for a licensed contractor. Murtex Electric Inc. is a Licensed Electrical Contractor, ESA Pre-Authorized, serving North York, Toronto and surrounding areas — and available 24/7 when the work runs long.
Questions, answered
What is a fused main disconnect?
A fused main disconnect is a single fuse-protected switch that can shut off power to an entire service. It sits ahead of the metering and distribution equipment, giving one clear point where everything downstream can be turned off. On this North York fourplex, we installed one as part of the new 200 amp service.
Can each unit in a fourplex have its own hydro meter?
Yes. A multi-gang meter base provides a separate meter position for each unit — on this job, a 4-gang meter base gives each of the four apartments its own meter, so usage is measured unit by unit. The metering layout is something to plan with your electrician before work begins, since utility requirements apply to how meters are installed.
Does a service upgrade have to be done by a licensed electrical contractor?
Service work is not a DIY project. In Ontario, electrical work is regulated, and service upgrades are handled by Licensed Electrical Contractors, with the Electrical Safety Authority (ESA) overseeing electrical safety. Murtex Electric Inc. is a Licensed Electrical Contractor and is ESA Pre-Authorized, serving Toronto and the GTA.
Do electricians work after dark or in bad weather?
When a job needs to be finished, yes. This North York fourplex service was completed at night, in the snow, with the crew clocking out at 9:18 PM. Murtex Electric Inc. is available 24/7 across Toronto and the GTA, so evening and winter work is part of how jobs like this get done.
This fourplex project shows what a proper multi-unit service looks like: a new service mast, a fused main disconnect, a 4-gang meter base with one meter for every unit, and conduit work bent to match — finished even when the snow and the clock said otherwise.
If you own or manage a fourplex or apartment building and need a 200 amp service upgrade in Toronto, talk to a contractor that does this work regularly. Murtex Electric Inc. is a Licensed Electrical Contractor, ESA Pre-Authorized, serving North York, Toronto and surrounding areas, 24/7.
To plan your service upgrade, call or text Murtex Electric Inc. at 6475292972.